The critical path time for the following critical path method (CPM) diagram is days. (Fill in the blank.)
owner
• architect
• mechanical contractor
• electrical contractor
• interior designer
• general contractor
• commissioning agent
• electrical engineer
• mechanical engineer
• civil engineer
• lighting designer
• structural engineer